Thursday, March 11, 2010

OSI QUAD Advanced Formula Sealant


eyewall Armor Flood Barrier Systems






The eyewall Armor Flood Barrier System is designed in accordance with:

• The Florida Building Code, 2004 & 2007 Edition including the HVHZ - High Velocity Hurricane Zone Provisions.

• The American Society of Civil Engineers Standards ASCE 7-05 (minimum design loads for buildings and other structures).

• FEMA Technical Bulletin 3-93 (Non-Residential Flood Proofing Requirements and Certification).

Titan Roll Down Screens